Based on the practice of cable support in Xiezhuang Coal Mine, analysis is made on the design of cable support, construction procedure and assemblage of tools, calculation on supporting effect, problems in construction field, loss and compensation to pre-stress and monitor on working quality to increase the reliability.
参考文献
相似文献
引证文献
引用本文
刘玉元,赵海之,吴春汶,等.巷道锚索支护体系的建立与可靠性分析[J].钻探工程,2005,32(4):59-63.LIU Yu-yuan, ZHAO Hai-zhi, WU Chun-wen, et al. Establishment of Cable Supporting System in Tunnel and Analysis on the Reliablity[J]. Drilling Engineering, 2005,32(4):59-63.