The practice experience and construction result of directly put leoss near by the engineering site into borehole to make mud when making bored piles in sand formations were introduced.
参考文献
相似文献
引证文献
引用本文
陈春生.砂类土层钻孔灌注桩施工中泥浆的运用[J].钻探工程,2005,32(2):12-14.CHENG Chun- sheng. Mud Application in Bored Pile in Sand Formations[J]. Drilling Engineering, 2005,32(2):12-14.