长江漫滩某静压桩承载力出现偏差的原因分析及处理
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TU473.11

基金项目:


Analysis and Measure of Bearing Capacity Deficiency in One Static-press Pile at the Side of Yangtse River
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    位于长江南岸堤圩区某变电所综合楼地基上部为厚层淤泥土,设计采用静压钢筋泥凝土预制桩。试桩的基桩静载荷试验全部满足设计要求,而工程桩静压载荷试验有50%的基桩承载力达不到设计要求。分析了场地的工程地质条件、影响桩静载荷试验承载力的施工因素、群桩的时间效应和群桩的挤土效应等,有针对性地进行了处理,满足了工程设计要求。

    Abstract:

    The upper section of the foundation of one substation building, which is located on a dyke section of the south side of Yangtze River, contains a thick layer of slit. The static-press poles of precast steel reinforced concrete were adopted. All static-loading examinations on test piles met requests of design, but among the same examinations on engineering piles, there were only 50 percentage of piles the requests. The article analyses the engineering geological condition of the site at first, discusses in details on construction factors, squeezing-effect and time-effect of group-pile which affect static-load examinations on engineering piles; at last, based on the main causes, some corresponding measures are given to meet the design in the article.

    参考文献
    相似文献
    引证文献
引用本文

黄兴怀,王国强.长江漫滩某静压桩承载力出现偏差的原因分析及处理[J].钻探工程,2005,32(1):10-12.
HUANG Xing-huai, WANG Guo-qiang. Analysis and Measure of Bearing Capacity Deficiency in One Static-press Pile at the Side of Yangtse River[J]. Drilling Engineering, 2005,32(1):10-12.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2004-09-06
  • 最后修改日期:2004-09-06
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
文章二维码