This paper describes the remedial works adopted for soil collapsed during bored pile excavation for the advance contract for route 5 section between Shek Wai Kok & Chai Wan Kok in Hong Kong.
汤捷.香港五号干线前期工程大直径钻孔桩塌孔事故的处理[J].钻探工程,2005,32(1):6-9. TANG Jie. Management of Borehole Cave-in in Front-end Engineering of Hong Kong Route 5[J]. Drilling Engineering, 2005,32(1):6-9.