Management of Borehole Cave-in in Front-end Engineering of Hong Kong Route 5
Author:
Affiliation:
Fund Project:
摘要
|
图/表
|
访问统计
|
参考文献
|
相似文献
|
引证文献
|
资源附件
|
文章评论
摘要:
主要介绍在香港五号干线前期工程石围角至柴湾角段的灌注桩桩墙施工中的塌孔事故的处理。
Abstract:
This paper describes the remedial works adopted for soil collapsed during bored pile excavation for the advance contract for route 5 section between Shek Wai Kok & Chai Wan Kok in Hong Kong.
参考文献
相似文献
引证文献
引用本文
汤捷.香港五号干线前期工程大直径钻孔桩塌孔事故的处理[J].钻探工程,2005,32(1):6-9.TANG Jie. Management of Borehole Cave-in in Front-end Engineering of Hong Kong Route 5[J]. Drilling Engineering, 2005,32(1):6-9.