According to characteristic of the city underground engineering, Combining the instance of underground pass in the rich water sands in the one city, the way of ground dewatering has analyzed and dewatering result of deep well has qualitatively analyzed to subside to the earth's surface, around building correctly subside at the same time. Observe results indicate that the way can be full of project needs. The paper has offered the construction example for the underground engineering in the rich water sand layer.
参考文献
相似文献
引证文献
引用本文
李付法,陈强.在富水砂层修建城市地下过街道的施工技术[J].钻探工程,2005,32(10):50-52.LI Fu-fa, CHEN Qiang. Construction Technology of City Underground Pass in Rich Water Sands[J]. Drilling Engineering, 2005,32(10):50-52.