    摘要:

    介绍了4种方向可控的土层挤密式非开挖管线铺设方法:可控冲击矛挤密工法、可控冲击矛水平钻进技术、先导式土层挤密施工技术和土层挤密式微型隧道施工技术。同时,还对各种施工方法的使用条件和应用情况作了简要论述。

    Abstract:

    This paper presents four kinds of direction controllable trenchless techniques for pipeline installation. The principle of these techniques, including controllable impact moling, horizontal drilling with controllable pneumatic hammer, soil displacement pilot hole drilling technique and soil displacement micro-tunneling, is that the soils are displaced to the hole wall rather than removed to the ground surface during construction. In addition, the suitable conditions for each method are introduced.

    参考文献
    相似文献
    引证文献
引用本文

马保松,D. Stein.可控土层挤密非开挖管线铺设方法及应用[J].钻探工程,2003,30(6):52-55.
MA Bao-song, D. Stein. Controllable Soil Displacement No-dig Pipeline Installing Methods and Their Applications[J]. Drilling Engineering, 2003,30(6):52-55.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2002-11-20
  • 最后修改日期:2003-06-04
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
文章二维码