软基上高速铁路路桥过渡段的技术措施研究
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

U443

基金项目:


Study on Technical Measures of the Soft-foundation in the Transition Section from Road to Bridge for Express Railway
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    通过对高速铁路路基与桥梁过渡段动力特性分析 ,指出结构物沉降差是导致轨面不平顺的主要因素。分析了沉降差产生的原因 ,提出了软基上路桥过渡段的结构设计方案 ,并对其施工方法及质量检测标准进行了探索

    Abstract:

    Main reasons, of which settlement differences of structure materials lead to uneven rail surface, were pointed out through dynamical characteristic analysis of express railway foundation of the transition section from road to bridge. The reasons of settlement differences were analyzed and design program of soft foundation of the transition section from road to bridge was presented. The measures and quality inspection standards also were discussed.

    参考文献
    相似文献
    引证文献
引用本文

杨广庆,彭华,刘建坤.软基上高速铁路路桥过渡段的技术措施研究[J].钻探工程,2002,(5):13-15.
YANG Guang qing, PENG Hua, LIU Jian kun . Study on Technical Measures of the Soft-foundation in the Transition Section from Road to Bridge for Express Railway[J]. Drilling Engineering, 2002,(5):13-15.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:2001-08-29
  • 录用日期:
  • 在线发布日期:
  • 出版日期: 2002-09-25
文章二维码