The combination of vacuum point well and pipe well can greatly take the advantages of both. This method not only contents the ground water level after lowering, but also can quickly remove detained ground water. So the slope will be more stability due to the remove of parietal seepage caused by the detained ground water.
参考文献
相似文献
引证文献
引用本文
王小刚 岑文龙.轻型井点与管井结合方式在深大基坑降水中的应用[J].钻探工程,2000,(5):40-41.WANG Xiao gang, CEN Wen long. Using both Vacuum Point Well and Pipe Well to Dewater Deep and Large Fou ndation Pit[J]. Drilling Engineering, 2000,(5):40-41.