Some multi processes newly developed are described with their uses, which includes drilled expanded compaction piling, rammed naturally graded stone column with simultaneous heavy hammer casing, drilled back fill mixed slurry piling, and drilled expanded piling with simultaneous casing.
参考文献
相似文献
引证文献
引用本文
方雪松 李江林 郭鹏举.复合地基综合施工法的应用研究[J].钻探工程,2000,(5):35-37.FANG Xue song, LI Jiang lin, GUO Peng ju. Multi-process for Combined Foundation Construction[J]. Drilling Engineering, 2000,(5):35-37.