Three conditions for the hole wall stabilization of large diameter bored pile-static balance, geological seepage flow and time factor are presented based on theoretical analysis and practical experience. Measures preventing and handling hole caving are given based upon analyzing various factors that influence hole wall stability including objective, technological, environmental and artificial factors.
参考文献
相似文献
引证文献
引用本文
罗绍明,朱文鉴.大口径钻孔桩孔壁稳定分析研究[J].钻探工程,2000,(1):35-37.LUO Shaoming. Analysis and Research on Stability of Large Diameter Bored Pile Hole[J]. Drilling Engineering, 2000,(1):35-37.