Combined lining of the primary bolting and shotcrete lining and the secondary formwork puring concrete lining is applied to the system of waterproofing and drainage at Yanlieshan tunnel of Jiujiang Jingdezhen road. The design, construction and quality control of the system are introduced.
参考文献
相似文献
引证文献
引用本文
何凌坚,李世京.九景公路雁列山隧道复合式衬砌防排水的设计与施工[J].钻探工程,1999,(6):39-41.He Lingjian. Design and Construction of Waterproofing and Drainage Utilizing Combined Lining at Yanlieshan Tunnel of Jiujiang Jingdezhen Road[J]. Drilling Engineering, 1999,(6):39-41.