    九江至景德镇高速公路雁列山隧道防排水系统采用初期锚喷砼和二次模注砼的复合衬砌形式。介绍了其设计、施工及质量缺陷的整治措施。

    Abstract:

    Combined lining of the primary bolting and shotcrete lining and the secondary formwork puring concrete lining is applied to the system of waterproofing and drainage at Yanlieshan tunnel of Jiujiang Jingdezhen road. The design, construction and quality control of the system are introduced.

    参考文献
    相似文献
    引证文献
引用本文

何凌坚,李世京.九景公路雁列山隧道复合式衬砌防排水的设计与施工[J].钻探工程,1999,(6):39-41.
He Lingjian. Design and Construction of Waterproofing and Drainage Utilizing Combined Lining at Yanlieshan Tunnel of Jiujiang Jingdezhen Road[J]. Drilling Engineering, 1999,(6):39-41.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期: 1999-11-25
文章二维码