The advanced anchor short cycle method used for solving the technical problems encountered while constructing tunnel branch portal in sandy and gravel formation is introduced. Safety technical requirements referring to state run road, pressure lifting station and the important buildings nearby are met.
参考文献
相似文献
引证文献
引用本文
廖光海,罗其标.超前锚杆短循环法在砂砾石隧洞挂口施工中的应用[J].钻探工程,1999,(5):54-55.Liao Guanghai, Luo Qibiao. Application of Advanced Anchor Short Cycle Method to Constructing Tunnel Branch Portal in Sandy and Gravel Formation[J]. Drilling Engineering, 1999,(5):54-55.