The experience for cutting and demolishing of the ball mill foundation at a cement plant using controlled balsting is introduced. Also applied successfully is the method of millisecond multi relay ignition by the non electric detonator outside holes, in order to increase the relays of detonation in controlled blasting.
参考文献
相似文献
引证文献
引用本文
黄常波,陈建平.水泥厂球磨机基础切割拆除控制爆破[J].钻探工程,1998,(6):52-54.Huang Changbo Chen Jianping. Cutting and Demolishing of the Ball Mill Foundation at a Cement Plant Using Controlled Blasting[J]. Drilling Engineering, 1998,(6):52-54.