Most of the newly located holes for the exploration of the old mines are infilled between or lie behind two existing holes. In the light of this feature, the design method of the axis of the newly positioned hole is presented with the kicking off and deviation correction measures, resulting in good effect.
参考文献
相似文献
引证文献
引用本文
樊腊生,陈尚喜.多宝山-铜山陡斜矿体深孔受控定向钻进工艺[J].钻探工程,1998,(2):31-32.Fan Lasheng. Controlled Directional Deep Hole Drilling in The Sharp Slanted Orebody at Duobaoshang Tongshan[J]. Drilling Engineering, 1998,(2):31-32.