The grout injection with ground fracturing after pile completion. mechanism of increasing the single-pile bearing capacity, equipment employed, operating method, technical parameters and operating considerations are described. A preliminary discussion is made on the injection volume and the injection pressure with ground fracturing.
参考文献
相似文献
引证文献
引用本文
陈振,何文生.桩后劈裂压浆施工技术[J].钻探工程,1997,(4):11-13.Chen Zhen, He Wensheng. Grout Injection with Ground Fracturing After Pile Completion[J]. Drilling Engineering, 1997,(4):11-13.