It is necessary to prefabricate hollow pile sections and the conductor casing for the construction of 3 to 4. 4m hollow piles. The drilling process, pile section assembly and grout injection are described. The hollow pile exhibits unque adventage over the solid one.
参考文献
相似文献
引证文献
引用本文
冯宗才,范清明,陆祖安.石龟山大桥直径3~4.4m空心桩施工技术[J].钻探工程,1997,(1):21-24.Feng Zongcai, Fan Qingming, Lu Zu'an. [J]. Drilling Engineering, 1997,(1):21-24.