钻孔灌注桩桩端桩侧压浆新工艺的应用
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TU473.14

基金项目:


A New Method Used for Bored Pile End and Sides Grouting
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    通过钻孔灌注桩桩端桩侧高压注浆新工艺在上海地区的首次试用及试桩资料的分析比较,探讨了该新工艺方法提高单桩垂直承载力的机理,强调了长径比较大的钻孔灌注极采用极端压浆,特别是桩侧压浆,对于提高单桩垂直承载力具有明显效果。并详细介绍了该新工艺的施工方法。

    Abstract:

    Based on the first trial use of a new method for grouting at the bored pile end and sides, analysis and comparison of the trial pile information, the mechanism of increasing the single pile vertical bearing capacity by the new method is investigated. It is stressed that pressure grouting at the pile end,especially the pile sides,increases the single pile vertical bearing capacity greily. The construction method of the new method is detailed.

    参考文献
    相似文献
    引证文献
引用本文

毛广陵.钻孔灌注桩桩端桩侧压浆新工艺的应用[J].钻探工程,1996,(6):26-29.
Mao Guangling. A New Method Used for Bored Pile End and Sides Grouting[J]. Drilling Engineering, 1996,(6):26-29.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期:
文章二维码