considering problems existing in auger,underreamed piles in loose sand and boulder formation,auger drilled and hydraulic underreamed grouted piling technique is developed successfully applied,Description is fo-cused on structure of drill rig and underreamer,as well as technical economical benefit.
参考文献
相似文献
引证文献
引用本文
吴振仁.螺旋钻孔液力扩底注浆桩基础工艺[J].钻探工程,1995,(1):25-28.. Procedures of Auger Drilled and Hydraulic Underrreamed Grouted Pile[J]. Drilling Engineering, 1995,(1):25-28.