Abstract:Description is forcused on the drilling method and completion process of large diameter drainage holes in Huaibei coal mine. Full-sized drilling tools are used for deivation prevention,the best placedment of the upper,middli and lower stabilizers is determined, et drilling is chosen to increase drilling rate,and the check valve type floating plug located at the tube end is employed to tackle tube lowering and grouting problems.