The program of composing the construction network planning and the method of estimating the time spent on each construction step are described. The methods of time co- ordinate network profile drawing, network optimization and network management are discribed by exampes.
参考文献
相似文献
引证文献
引用本文
高长胜.用网络计划进行生产管理[J].钻探工程,1994,(4):54-56.GaO Changsheng. Application of Network Planing in Production Management[J]. Drilling Engineering, 1994,(4):54-56.