河南省第一地质大队有限公司,河南 郑州 450016Henan First Geological Brigade Co., Ltd., Zhengzhou Henan 450016, China
Clc Number:
P634
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
To address the problems of tight schedule and frequent accidents in deep-hole core drilling in the Chating copper polymetallic mining area, the mechanisms of downhole accidents such as out-of-tolerance borehole deviation, casing fall-off, drill pipe fracture, and bit burning were analyzed in combination with the formation conditions and engineering practice of the mining area. A total of 62 boreholes were designed, with depths of 1000~2000 m, a total drilling footage of 96240 m, and an exploration spacing of 50 m. Three-spud and four-spud borehole structures were adopted according to hole depth; impregnated diamond bits and bentonite/KCl polymer-sulfonate staged drilling fluid systems were used; and drilling parameters were optimized. The results show that spudding-in before foundation solidification, improper casing placement, and human operational errors were the main causes of accidents. After the application of treatment techniques such as directional deviation correction with a positive displacement motor, artificial bottom hole with a cement plug, hole reaming, casing isolation of chloritic rock, reverse-thread drill pipe fishing, milling and jointing, and wire rope fishing without an inner tube, the drift angle of borehole ZK4503 decreased from 4.82° at 700 m to 0.4° at 1000 m, and drilling in borehole ZK4714 was resumed after 46 days of treatment for multiple downhole accidents. Spudding-in quality directly determines the effectiveness of deep-hole drilling, and high-quality spudding-in can reduce non-drilling time by 15%~30%. This study provides an engineering reference for deep-hole core drilling in this mining area and mining areas with similar conditions.