Analysis of high-quality drilling construction technology for geothermal wells under the new situation
CSTR:
Author:
Affiliation:

河北伟业地热新能源科技有限公司,河北 邯郸 057650Hebei Weiye Geothermal New Energy Technology Co., Ltd., Handan Hebei 057650, China

Clc Number:

TE249;P634.5

Fund Project:

河北省省级科技计划资助项目 235A4601D河北省省级科技计划资助项目(编号:235A4601D)

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Geothermal drilling construction is a rigorous work with high professional requirements, and the matched equipment and process tools are the guarantee for the smooth progress of construction. It is critical to improve the professional quality of the team and the technical capacity of the unit, as well as adopting advanced technology under the new situation. In addition, China''s geothermal market is expanding toward the deep strata, which brings increasing construction difficulties. Construction enterprises with proprietary construction technologies and characteristics can maintain development momentum and gain competitive advantages in the market. This paper analyzes some specific problems in geothermal well construction, and points out that multi-process air drilling is an effective method for high-quality and efficient exploitation of deep geothermal and groundwater resources.

    Reference
    Related
    Cited by
Get Citation
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:June 24,2026
  • Revised:July 27,2026
  • Adopted:July 27,2026
  • Online: October 29,2026
  • Published: October 20,2026
Article QR Code