1安徽省地质矿产勘查局313地质队,安徽 六安 2370101Anhui Geology and Mineral Bureau 313 Team, Lu'an, Anhui 237010, China;2北京探矿工程研究所,北京 1000832Beijing Institute of Exploration Engineering, Beijing 100083, China
Clc Number:
P634
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
In thick loose overburden covered areas such as Fuyang and Bozhou in northern Anhui, the incidence of downhole accidents including borehole shrinkage and collapse during drilling exceeds 80%. By analyzing the characteristics of loose layers, this paper reveals the chain instability mechanism of borehole walls dominated by "hydration expansion-particle migration-mud cake failure". The key control indicators are proposed, including the filtration loss of flushing fluid ≤5 mL/30 min and mud cake cohesion>8 kPa, which can ensure the safety of long open-hole drilling for more than three months. A composite flushing fluid system consisting of KPAM, NH4-HPAN, PAC-LV and ultrafine calcium carbonate is developed, and a technical process featuring "layered targeted treatment+plugging while-drilling+short tripping" is formed. The verification of four test boreholes shows that the borehole wall stability coefficient increases from 0.51 to 0.89, the accident handling time is reduced by 100%, the mechanical drilling rate is increased by 32.8%, and the monthly drilling efficiency of a single rig exceeds 800 m. The research results can provide technical support for drilling engineering in similar thick loose overburden layers.