Research on drilling construction technology for CO2 geological storage in deep saline aquifers: A case study of the first CO2 geological storage project in deep saline aquifers in Shandong Province
CSTR:
Author:
Affiliation:

1山东省地质矿产勘查开发局第二水文地质工程地质大队(山东省鲁北地质工程勘察院),山东 德州 2530721The Second Institute of Hydrogeology and Engineering Geology, Shandong Provincial Bureau of Geology & Mineral Resources (Lubei Geo-Engineering Exploration Institute of Shandong Province), Dezhou Shandong 253072, China;2山东科技大学地球科学与工程学院,山东 青岛 2665902College of Earth Science and Engineering, Shandong University of Science and Technology, Qingdao Shandong 266590, China

Clc Number:

P634;X51

Fund Project:

山东省地质矿产勘查开发局2022年度地质勘查引领示范与科技攻关项目 鲁地字〔2022〕15号山东省地质矿产勘查开发局2022年度地质勘查引领示范与科技攻关项目(编号:鲁地字〔2022〕15号)

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The wellbore serves as the pathway for CO2 injection into the target formation and constitutes the fundamental basis for long-term monitoring and research on both the CO2 injected into the formation and its impact on it. Compared with conventional geothermal drilling, the wellbore of CO2 geological storage in deep saline aquifers requires higher standards of sealing and corrosion resistance. This study takes the first CO2 geological storage project in deep saline aquifers in Shandong Province as an example, the difficulties in drilling construction are listed, the main technical countermeasures are offered, and guidance for drilling construction of other CO2 geological storage projects in deep saline aquifers is provided. The research results show that during the drilling construction process, the rapid drilling and corresponding mud wall protection technologies are adopted to solve the problem of poor wellbore stability. The difficulty of core sampling was solved by adding a spring clip device to prevent core from falling at the bottom of the coring tube. High-strength casing is used to solve the gas tightness and safety problems of the casing. The integrated technology of cementing, perforating and well completion using BCE-750S anti-corrosion cement is adopted to solve the problem of cement corrosion. By adding the slips packer device to the CO2 injection pipe string, the gas tightness and stability of CO2 injection are guaranteed. At the same time, the oil wellhead device in the oil production field is adopted, and a pressure monitoring instrument is installed to solve the long-term pressure-bearing and monitoring problems of the wellhead device.

    Reference
    Related
    Cited by
Get Citation
Related Videos

Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 11,2026
  • Revised:July 17,2026
  • Adopted:July 24,2026
  • Online: October 29,2026
  • Published: October 20,2026
Article QR Code