茶亭铜多金属矿区深孔岩心钻探工艺与事故处理
CSTR:
作者:
作者单位:

河南省第一地质大队有限公司

作者简介:

通讯作者:

中图分类号:

P634

基金项目:


Deep hole core drilling technology and accident treatment in Chating copper polymetallic mining area
Author:
Affiliation:

河南省第一地质大队有限公司,河南 郑州 450016Henan First Geological Brigade Co., Ltd., Zhengzhou Henan 450016, China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对茶亭铜多金属矿区深孔岩心钻探工期紧、事故多发的难题,结合矿区地层与工程实践,分析孔斜超差、套管脱落、钻杆断裂、烧钻等孔内事故机理。矿区设计钻孔62个,孔深1000~2000 m,总工作量96240 m,勘探间距50 m,按孔深采用三开、四开钻孔结构,配套孕镶金刚石钻头及膨润土/氯化钾聚磺分级冲洗液体系,并优化钻进规程参数。结果表明:地基未完全固化开钻、套管不到位及人为误操作是事故主因;采用螺杆钻具定向纠斜、水泥人工孔底、修孔、套管隔离绿泥岩、反丝钻杆打捞、磨铣对接及无内管捞取钢丝绳等处置技术后,ZK4503孔顶角由700 m处4.82°降至1000 m处0.4°,ZK4714孔多重事故经46 d处理恢复钻进。开孔质量直接决定深孔钻探成效,高质量开孔可减少15%~30%非钻进时间。研究可为该矿区及类似条件矿区深孔岩心钻探提供工程借鉴。

    Abstract:

    To address the problems of tight schedule and frequent accidents in deep-hole core drilling in the Chating copper polymetallic mining area, the mechanisms of downhole accidents such as out-of-tolerance borehole deviation, casing fall-off, drill pipe fracture, and bit burning were analyzed in combination with the formation conditions and engineering practice of the mining area. A total of 62 boreholes were designed, with depths of 1000~2000 m, a total drilling footage of 96240 m, and an exploration spacing of 50 m. Three-spud and four-spud borehole structures were adopted according to hole depth; impregnated diamond bits and bentonite/KCl polymer-sulfonate staged drilling fluid systems were used; and drilling parameters were optimized. The results show that spudding-in before foundation solidification, improper casing placement, and human operational errors were the main causes of accidents. After the application of treatment techniques such as directional deviation correction with a positive displacement motor, artificial bottom hole with a cement plug, hole reaming, casing isolation of chloritic rock, reverse-thread drill pipe fishing, milling and jointing, and wire rope fishing without an inner tube, the drift angle of borehole ZK4503 decreased from 4.82° at 700 m to 0.4° at 1000 m, and drilling in borehole ZK4714 was resumed after 46 days of treatment for multiple downhole accidents. Spudding-in quality directly determines the effectiveness of deep-hole drilling, and high-quality spudding-in can reduce non-drilling time by 15%~30%. This study provides an engineering reference for deep-hole core drilling in this mining area and mining areas with similar conditions.

    参考文献
    相似文献
    引证文献
引用本文

张东兴,时志兴.茶亭铜多金属矿区深孔岩心钻探工艺与事故处理[J].钻探工程,2026,53(S1):250-255.
ZHANG Dongxing, SHI Zhixing. Deep hole core drilling technology and accident treatment in Chating copper polymetallic mining area[J]. Drilling Engineering, 2026,53(S1):250-255.

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2026-08-10
  • 最后修改日期:2026-09-18
  • 录用日期:2026-09-18
  • 在线发布日期: 2026-10-29
  • 出版日期: 2026-10-20
文章二维码