基于物理约束重构的深部地热硬岩钻井提速综述
CSTR:
作者:
作者单位:

1中国地质调查局水文地质环境地质调查中心,天津 300309;2犹他大学能源与地球科学研究所,美国 盐湖城 84112;3中国地质科学院勘探技术研究所,天津 300399;4北京探矿工程研究所,北京 100083;5中国地质科学院探矿工艺研究所,四川 成都 611734

作者简介:

通讯作者:

中图分类号:

P634;TE249

基金项目:

国家重点研发计划项目(编号:2025YFF0519900);中国地质调查局地质调查项目(编号:DD20231000809)


Review of ROP improvement for deep geothermal hard rock drilling based on physical-limiter redesign
Author:
Affiliation:

1Center for Hydrogeology and Environmental Geology Survey, China Geological Survey, Tianjin 300309, China;2Energy & Geoscience Institute, the University of Utah, Salt Lake City 84112, USA;3Institute of Exploration Techniques, CAGS, Tianjin 300399, China;4Beijing Institute of Exploration Engineering, Beijing 100083, China;5Institute of Exploration Technology, CAGS, Chengdu Sichuan 611734, China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    深部地热与干热岩资源开发面临高温、高应力及结晶岩地层强非均质性等复杂工程条件,机械钻速低、钻头寿命短是制约其规模化开发的关键技术瓶颈,并直接推高钻井成本。深部地热钻井存在地层?钻头?钻具?钻井液?装备多系统耦合作用,工况参数安全边界难以预先精确设定;传统依靠经验调参或单一工艺优化的手段,无法从多耦合变量中识别制约钻进效率的主导约束因素。美国Utah FORGE等高温硬岩地热钻井项目发展出一套以钻头碎岩机理与机械碎岩比功为理论基础、以钻井系统动力学响应为判识依据的物理约束识别与重构提速方法,该方法在175~230 ℃花岗岩地层可实现20 m/h以上的机械钻速,钻头寿命300~800 m。本文系统梳理该方法的理论体系,以Utah FORGE、Fervo Energy、Geysers GDC?36井、瑞士GVL?1井为典型工程案例,提炼“参数阶梯加载?工况响应判识?针对性重构?迭代验证”标准化现场作业流程;结合中国共和盆地干热岩钻井实测资料,从钻压与转速的极限加载能力、下部钻具组合的动力学稳定性、地面装备的功率与排量配套等维度对比中美钻井系统性能差距,论证该技术体系在中国深部高温硬岩地热钻井中的适用条件与实施边界,为中国深部地热、深层?超深层硬岩钻探工程的科学化提速决策提供理论依据与工艺参考。

    Abstract:

    Deep geothermal and hot dry rock (HDR) development faces complex engineering conditions including high temperature, high in-situ stress, and strongly heterogeneous crystalline rocks; low rate of penetration (ROP) and high drilling investment remain the key technical bottlenecks constraining large-scale development. Deep geothermal drilling involves multi-system coupling of rock, bit, drill string, drilling fluid and surface equipment, and safe operating envelopes cannot be precisely predefined, so conventional empirical parameter adjustment or single-process optimization fail to identify the truly dominant constraint factors restricting penetration efficiency among the many coupled variables. In recent years, high-temperature hard-rock drilling projects such as Utah FORGE have progressively developed a "physical limiter identification and redesign" drilling performance improvement method, built on the physical foundations of bit-rock cutting mechanics and mechanical specific energy (MSE), with drilling-system dynamic response serving as the diagnostic basis; in granite rock at 175~230 °C, this method has achieved stable ROP above 20 m/h and single-run bit footage of 300~800 m. This paper systematically reviews the theoretical system of the method and, taking the Utah FORGE, Fervo Energy, and Geysers GDC-36 well together with the Swiss GVL-1 well as representative engineering cases, summarizes a standardized field workflow of "stepwise parameter loading-response-based diagnosis-targeted redesign-iterative verification." Combined with measured data of hot dry rock drilling in the Gonghe Basin, the performance gaps between Chinese and American drilling systems are analyzed in terms of ultimate WOB and RPM loading capacity, dynamic stability of bottom hole assembly (BHA), and surface equipment power and pump rate matching, and the applicable conditions and implementation boundaries of this technical system for deep high-temperature hard-rock geothermal drilling in China are discussed. The reviewed methodology and case analyses provide a theoretical basis and process reference for a theoretical basis and process reference for scientific decision-making of performance improvement in deep geothermal as well as deep and ultra-deep hard-rock drilling.

    参考文献
    相似文献
    引证文献
引用本文

吴海东,李梦,张二勇,等.基于物理约束重构的深部地热硬岩钻井提速综述[J].钻探工程,2026,53(6):92-103.
WU Haidong, LI Meng, ZHANG Eryong, et al. Review of ROP improvement for deep geothermal hard rock drilling based on physical-limiter redesign[J]. Drilling Engineering, 2026,53(6):92-103.

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2026-05-12
  • 最后修改日期:2026-06-05
  • 录用日期:2026-06-12
  • 在线发布日期: 2026-11-27
  • 出版日期: 2026-11-10
文章二维码